Item PROJECT DENOMINATION CLIENT DELIVERY DATE
1 Lindane Plant
Detail Engineering
OLTCHIM
OLTQUINO
1998
2 Revamp of Electrolysis IV
Detail Engineering
OLTCHIM
UHDE
1997
3 Wastes incineration & HCl recovery
Detail Engineering
OLTCHIM
KREBS
1997
4 Additional steam boiler for Pyrolysis Unit
Full Engineering
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
1997
5 Sodium cyanide
Detail Engineering
PETROM-OMV
ARPECHIM BRANCH
LITWIN FRANCE
1997
6 Thermorom Steam boiler installation 25 t/h in DMT plant
Full Engineering
SNP-PETROM
ARPECHIM BRANCH
1996
7 Oil terminal (Galati)
Development
Full Engineering
UNICOM 1997
8 Oil terminals in Halmeu,
Dornesti, Holboca, Tulcea
Full Engineering
UNICOM TRANZIT 1998
9 Cogeneration Plant 60 MW
Detail Engineering (alongside ISPE)
PETROM-OMV
PETROBRAZI BRANCH
HYUNDAI
2000
10 Demineralized Water Plant
Detail Engineering
PETROM-OMV
PETROBRAZI BRANCH
ISPE
2000
11 Methanation Plant I & II
Full Engineering
PETROM-OMV
ARPECIM BRANCH
2000
12 Sea terminal for LPG & petroleum products
Full Engineering
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2001
13 Hydrodesulphurization of cracked heavy gas oil
Full Enginnering
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2002
14 Replacement of vacuum distillate hydrofining reactor
Full Enginnering
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2002
15 Petroleum products loading & unloading platform customized to crude oil unloading
Full Enginnering
ROMINSERV S.A. For
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2002
16 Polyethylene Packing Bags Unit (Extruder) 250 kg/h
Detail Enginnering
PETROM-OMV
ARPECHIM BRANCH
RAIFENHÄUSER Germany
2002
17 HDPE Packing and Palletizing Unit 1200 bags/h
Detail Enginnering
PETROM-OMV
ARPECHIM BRANCH
MÖLLERS Germany
2002
18 Polypropylene Packing and Palletizing Unit 900 bags/h
Detail Engineering
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
MÖLLERS Germany
2002
19 Feasibility Study for PTA Plant PETROM-OMV
PETROBRAZI BRANCH
2002
20 Solution study for implementation of power supply system based on natural gas ROMGAZ MEDIAS 2003
21 Propane and propylene cylindrical storage tanks
Full Engineering
PETROM-OMV
PETROBRAZI BRANCH
2003
22 Technical and financial study for Ethane Dichloride Plant ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2002
23 C5+ isomerization within Petromidia, 60,000 t/y
Full Engineering
ROMINSERV S.A. for
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2003
24 Installation of an additional hydrofining reactor within VDH plant 1.5 Mb/d
Full Engineering
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2003
25 In-line Blending Plant
Detail Engineering
ROMINSERV S.A.
FMC Blending & Transfer USA
2003
26 Propylene Advanced Purifying System
Full Engineering – internal floating roof, automatic tank
dewatering system, fire fighting system, RADAR
ROMINSERV S.A.for
ROMPETROL RAFINARE
PETROMIDIA COMPLEX
2003
27 Revamp of fuel oil storage tanks
Full Engineering
PETROM-OMV
CONSTANTA BRANCH
2004
28 Revamping of wastewater treatment plant
Detail Engineering
ROMINSERV S.A.
for
ROMPETROL RAFINARE S.A.
2005
29 Revamp of tanks sealing system
Full Engineering
PETROM-OMV
PETROBRAZI BRANCH
2003
30 Thermal Oxidation Plant
Detail Engineering
PETROM-OMV
ARPECHIM BRANCH
VICHEM FRANCE
2004
31 Revamp of waste water stripping plant
Full Engineering
ROMINSERV S.A. for
ROMPETROL RAFINARE S.A.
2005
32 Loading/ unloading system and cryogenic storage facilities
Full Engineering
ROMINSERV S.A. for
ROMPETROL RAFINARE S.A.
2005
33 Fiscal measuring system for excisable petroleum products
Detail Engineering
PETROMSERVICE
PETROM-OMV
2005
34 Flow rating system for petroleum products
Detail Engineering
ROMINSERV S.A.for
ROMPETROL RAFINARE S.A.
2005
35 Fiscal measuring system for excisable petroleum products
Detail Engineering
ROMINSERV S.A.for
ROMPETROL RAFINARE S.A.
2005
36 Revamp of Hamon cooling towers
Detail Engineering
PETROM-OMV
PETROBRAZI Branch
2004
37 Revamp of RC 1, RC2 cooling towers
Full Engineering
PETROM-OMV
PETROBRAZI Branch
2004
38 Revamp of polypropylene unit – 80,000 t/y
Full Engineering
ROMINSERV for
ROMPETROL PETROCHEMICALS
2004
39 Revamp of aviation fuel storage tanks
Full Engineering
PETROM AVIATION S.A. 2005
40 Revamp of aviation fuel storage tanks
Full Engineering
TULCEA AIRPORT 2005
41 Sulphur Recovery TGT Unit
Detail Engineering
PETROTEL Lukoil
LGI
2006
42 Control rooms protection for risk / environmental / safety improvement
Feasibility Study
OMV for
Arpechim Petrochemistry
2006
43 Revamp of landfill oily sludge separation processing plant
Detail Engineering
ROMINSERV S.A.for
ROMPETROL RAFINARE S.A
2007
44 On/off valves
Feasibility Study
OMV for
Arpechim Refinery
2007
45 Modernization of the flare system related to Steam Cracker II OMV for
Arpechim Refinery
2007
46 Optimization of the Fire Fighting Water Network System at Arpechim Petrochemistry
Feasibility Study
OMV PETROM for
Arpechim Petrochemistry
2008
47 Expandable Polystyrene Unit
Basic Engineering
INEOS NOVA 2009
48 Albotesti Tank Farm
Full Engineering
Epstein for OMV 2008
49 Sewage System Revamp – FEED OMV PETROM for
Petrobrazi Refinery
2009
50 Local control room protection – Feasibility Study OMV PETROM
Petrobrazi Refinery
2010
51 Fire Fighting System revamp – FEED OMV PETROM
Petrobrazi Refinery
2010
52 Revamp of Hamon Cooling Water System
Feasibility Study
OMV PETROM
Petrobrazi Refinery
2010
53 Local control room protection – FEED OMV PETROM
Petrobrazi Refinery
2010
54 4000 m3 LPG fuel depot and bottling station
Full engineering
BUTAN GAS ROMANIA 2011
55 Izomerization Unit revamp – FEED & Detail engineering OMV PETROM
Petrobrazi Refinery
2011
56 Diesel and gasoline transshipment facilities in Cristesti-Iasi border area
Detail engineering
COMPRESSOR PUMP
INDUSTRIAL
2011
57 HDV Unit reconfiguration
Detail Engineering
ROMINSERV S.A. for
Petromidia Refinery
2011
58 Revamp of chemical unloading stations
Feasibility Study & FEED
OMV PETROM
Petrobrazi Refinery
2011
59 Revamp and increase the performances for Cooling Towers and Cooling Systems
FEED
UOP – USAOMV PETROM
Petrobrazi Refinery
2011
60 Evaluation of LPG losses during storage and handling
Preliminary Study
BUTAN GAS ROMANIA 2011
61 Delayed Coker Unit revamp– Closed Blowdown System
Detail Engineering
ROMINSERV S.A. for
Petromidia Refinery
In progress
62 Hexan delivery pipeline to berth no. 9B
Detail Engineering
ROMINSERV S.A. for
Petromidia Refinery
2011
63 New DGRS Unit in Petrobrazi Refinery
Civil & steel structures
LE GAS INTEGRAL for
Petrobrazi Refinery
2012
64 FCC Dust Filter
FEED
OMV PETROM
Petrobrazi Refinery
2012
65 Revamp of the Utilities Networks (gas, air and nitrogen) in Petrobrazi Refinery
FEED
OMV PETROM
Petrobrazi Refinery
2012
66 New LPG Truck Loading Ramp
FEED
OMV PETROM
Petrobrazi Refinery
2012
67 Foam & cooling system for Petrobrazi storage tanks
Feasibility Study
OMV PETROM
Petrobrazi Refinery
2012
68 Replace turbines with electric motors
Detail Engineering
OMV PETROM
Petrobrazi Refinery
2012
69 Pipes and equipments technical expertise for the Pyrolysis Plant ROMINSERV S.A. for
Petromidia Refinery
In progress
70 C3+ hydrocarbons recovery unit
Feasibility Study
ROMPETROL RAFINARE
Petromidia Refinery
2013
71 Revamp of Waste Water Treatment Plant
Detail Engineering
WABAG WATER SERVICES for
Petrobrazi Refinery
In progress
72 LPG sampling system
Feasibility Study
OMV PETROM
Petrobrazi Refinery
2013
73 Implementation of Quality Risk Assessment Study requirements in Petrobrazi Refinery
Feasibility Study
OMV PETROM
Petrobrazi Refinery
2013
74 Install self washing filters on the water pumped from the Waste Water Treatment Plant
Detail Engineering
OMV PETROM
Petrobrazi Refinery
2013
75 Condensate recovery from steam tracers and drain steam system in Cogeneration Unit
Detail Engineering
OMV PETROM
Petrobrazi Refinery
In progress