Item | PROJECT DENOMINATION | CLIENT | DELIVERY DATE |
---|---|---|---|
1 | Lindane Plant Detail Engineering |
OLTCHIM OLTQUINO |
1998 |
2 | Revamp of Electrolysis IV Detail Engineering |
OLTCHIM UHDE |
1997 |
3 | Wastes incineration & HCl recovery Detail Engineering |
OLTCHIM KREBS |
1997 |
4 | Additional steam boiler for Pyrolysis Unit Full Engineering |
ROMPETROL RAFINARE PETROMIDIA COMPLEX |
1997 |
5 | Sodium cyanide Detail Engineering |
PETROM-OMV ARPECHIM BRANCH LITWIN FRANCE |
1997 |
6 | Thermorom Steam boiler installation 25 t/h in DMT plant Full Engineering |
SNP-PETROM ARPECHIM BRANCH |
1996 |
7 | Oil terminal (Galati) Development Full Engineering |
UNICOM | 1997 |
8 | Oil terminals in Halmeu, Dornesti, Holboca, Tulcea Full Engineering |
UNICOM TRANZIT | 1998 |
9 | Cogeneration Plant 60 MW Detail Engineering (alongside ISPE) |
PETROM-OMV PETROBRAZI BRANCH HYUNDAI |
2000 |
10 | Demineralized Water Plant Detail Engineering |
PETROM-OMV PETROBRAZI BRANCH ISPE |
2000 |
11 | Methanation Plant I & II Full Engineering |
PETROM-OMV ARPECIM BRANCH |
2000 |
12 | Sea terminal for LPG & petroleum products Full Engineering |
ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2001 |
13 | Hydrodesulphurization of cracked heavy gas oil Full Enginnering |
ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2002 |
14 | Replacement of vacuum distillate hydrofining reactor Full Enginnering |
ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2002 |
15 | Petroleum products loading & unloading platform customized to crude oil unloading Full Enginnering |
ROMINSERV S.A. For ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2002 |
16 | Polyethylene Packing Bags Unit (Extruder) 250 kg/h Detail Enginnering |
PETROM-OMV ARPECHIM BRANCH RAIFENHÄUSER Germany |
2002 |
17 | HDPE Packing and Palletizing Unit 1200 bags/h Detail Enginnering |
PETROM-OMV ARPECHIM BRANCH MÖLLERS Germany |
2002 |
18 | Polypropylene Packing and Palletizing Unit 900 bags/h Detail Engineering |
ROMPETROL RAFINARE PETROMIDIA COMPLEX MÖLLERS Germany |
2002 |
19 | Feasibility Study for PTA Plant | PETROM-OMV PETROBRAZI BRANCH |
2002 |
20 | Solution study for implementation of power supply system based on natural gas | ROMGAZ MEDIAS | 2003 |
21 | Propane and propylene cylindrical storage tanks Full Engineering |
PETROM-OMV PETROBRAZI BRANCH |
2003 |
22 | Technical and financial study for Ethane Dichloride Plant | ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2002 |
23 | C5+ isomerization within Petromidia, 60,000 t/y Full Engineering |
ROMINSERV S.A. for ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2003 |
24 | Installation of an additional hydrofining reactor within VDH plant 1.5 Mb/d Full Engineering |
ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2003 |
25 | In-line Blending Plant Detail Engineering |
ROMINSERV S.A. FMC Blending & Transfer USA |
2003 |
26 | Propylene Advanced Purifying System Full Engineering – internal floating roof, automatic tank dewatering system, fire fighting system, RADAR |
ROMINSERV S.A.for ROMPETROL RAFINARE PETROMIDIA COMPLEX |
2003 |
27 | Revamp of fuel oil storage tanks Full Engineering |
PETROM-OMV CONSTANTA BRANCH |
2004 |
28 | Revamping of wastewater treatment plant Detail Engineering |
ROMINSERV S.A. for ROMPETROL RAFINARE S.A. |
2005 |
29 | Revamp of tanks sealing system Full Engineering |
PETROM-OMV PETROBRAZI BRANCH |
2003 |
30 | Thermal Oxidation Plant Detail Engineering |
PETROM-OMV ARPECHIM BRANCH VICHEM FRANCE |
2004 |
31 | Revamp of waste water stripping plant Full Engineering |
ROMINSERV S.A. for ROMPETROL RAFINARE S.A. |
2005 |
32 | Loading/ unloading system and cryogenic storage facilities Full Engineering |
ROMINSERV S.A. for ROMPETROL RAFINARE S.A. |
2005 |
33 | Fiscal measuring system for excisable petroleum products Detail Engineering |
PETROMSERVICE PETROM-OMV |
2005 |
34 | Flow rating system for petroleum products Detail Engineering |
ROMINSERV S.A.for ROMPETROL RAFINARE S.A. |
2005 |
35 | Fiscal measuring system for excisable petroleum products Detail Engineering |
ROMINSERV S.A.for ROMPETROL RAFINARE S.A. |
2005 |
36 | Revamp of Hamon cooling towers Detail Engineering |
PETROM-OMV PETROBRAZI Branch |
2004 |
37 | Revamp of RC 1, RC2 cooling towers Full Engineering |
PETROM-OMV PETROBRAZI Branch |
2004 |
38 | Revamp of polypropylene unit – 80,000 t/y Full Engineering |
ROMINSERV for ROMPETROL PETROCHEMICALS |
2004 |
39 | Revamp of aviation fuel storage tanks Full Engineering |
PETROM AVIATION S.A. | 2005 |
40 | Revamp of aviation fuel storage tanks Full Engineering |
TULCEA AIRPORT | 2005 |
41 | Sulphur Recovery TGT Unit Detail Engineering |
PETROTEL Lukoil LGI |
2006 |
42 | Control rooms protection for risk / environmental / safety improvement Feasibility Study |
OMV for Arpechim Petrochemistry |
2006 |
43 | Revamp of landfill oily sludge separation processing plant Detail Engineering |
ROMINSERV S.A.for ROMPETROL RAFINARE S.A |
2007 |
44 | On/off valves Feasibility Study |
OMV for Arpechim Refinery |
2007 |
45 | Modernization of the flare system related to Steam Cracker II | OMV for Arpechim Refinery |
2007 |
46 | Optimization of the Fire Fighting Water Network System at Arpechim Petrochemistry Feasibility Study |
OMV PETROM for Arpechim Petrochemistry |
2008 |
47 | Expandable Polystyrene Unit Basic Engineering |
INEOS NOVA | 2009 |
48 | Albotesti Tank Farm Full Engineering |
Epstein for OMV | 2008 |
49 | Sewage System Revamp – FEED | OMV PETROM for Petrobrazi Refinery |
2009 |
50 | Local control room protection – Feasibility Study | OMV PETROM Petrobrazi Refinery |
2010 |
51 | Fire Fighting System revamp – FEED | OMV PETROM Petrobrazi Refinery |
2010 |
52 | Revamp of Hamon Cooling Water System Feasibility Study |
OMV PETROM Petrobrazi Refinery |
2010 |
53 | Local control room protection – FEED | OMV PETROM Petrobrazi Refinery |
2010 |
54 | 4000 m3 LPG fuel depot and bottling station Full engineering |
BUTAN GAS ROMANIA | 2011 |
55 | Izomerization Unit revamp – FEED & Detail engineering | OMV PETROM Petrobrazi Refinery |
2011 |
56 | Diesel and gasoline transshipment facilities in Cristesti-Iasi border area Detail engineering |
COMPRESSOR PUMP INDUSTRIAL |
2011 |
57 | HDV Unit reconfiguration Detail Engineering |
ROMINSERV S.A. for Petromidia Refinery |
2011 |
58 | Revamp of chemical unloading stations Feasibility Study & FEED |
OMV PETROM Petrobrazi Refinery |
2011 |
59 | Revamp and increase the performances for Cooling Towers and Cooling Systems FEED |
UOP – USAOMV PETROM Petrobrazi Refinery |
2011 |
60 | Evaluation of LPG losses during storage and handling Preliminary Study |
BUTAN GAS ROMANIA | 2011 |
61 | Delayed Coker Unit revamp– Closed Blowdown System Detail Engineering |
ROMINSERV S.A. for Petromidia Refinery |
In progress |
62 | Hexan delivery pipeline to berth no. 9B Detail Engineering |
ROMINSERV S.A. for Petromidia Refinery |
2011 |
63 | New DGRS Unit in Petrobrazi Refinery Civil & steel structures |
LE GAS INTEGRAL for Petrobrazi Refinery |
2012 |
64 | FCC Dust Filter FEED |
OMV PETROM Petrobrazi Refinery |
2012 |
65 | Revamp of the Utilities Networks (gas, air and nitrogen) in Petrobrazi Refinery FEED |
OMV PETROM Petrobrazi Refinery |
2012 |
66 | New LPG Truck Loading Ramp FEED |
OMV PETROM Petrobrazi Refinery |
2012 |
67 | Foam & cooling system for Petrobrazi storage tanks Feasibility Study |
OMV PETROM Petrobrazi Refinery |
2012 |
68 | Replace turbines with electric motors Detail Engineering |
OMV PETROM Petrobrazi Refinery |
2012 |
69 | Pipes and equipments technical expertise for the Pyrolysis Plant | ROMINSERV S.A. for Petromidia Refinery |
In progress |
70 | C3+ hydrocarbons recovery unit Feasibility Study |
ROMPETROL RAFINARE Petromidia Refinery |
2013 |
71 | Revamp of Waste Water Treatment Plant Detail Engineering |
WABAG WATER SERVICES for Petrobrazi Refinery |
In progress |
72 | LPG sampling system Feasibility Study |
OMV PETROM Petrobrazi Refinery |
2013 |
73 | Implementation of Quality Risk Assessment Study requirements in Petrobrazi Refinery Feasibility Study |
OMV PETROM Petrobrazi Refinery |
2013 |
74 | Install self washing filters on the water pumped from the Waste Water Treatment Plant Detail Engineering |
OMV PETROM Petrobrazi Refinery |
2013 |
75 | Condensate recovery from steam tracers and drain steam system in Cogeneration Unit Detail Engineering |
OMV PETROM Petrobrazi Refinery |
In progress |